The vehicular carriageway with pedestrian passageway is an integral link and important for the efficient running of daily essential services and operations by Qantas. All engineers and Qantas managers were happy with the end result and to this end please find reference from our client for the project.
|
|
Recent Projects
|
Dangerous outer skin of brickwork to sheer wall, levels 4 and 5, required urgent attention. Following erection of safety steel scaffolding MDP tradesmen gently demolished brick by brick. Installed engineered steel brackets and rebuilt outer walls, followed by installation of stainless steel ties into concrete inner leaf of building, another difficult executed by the MDP team.
|
|
Recent Projects
|
Major render and unstable brick issues made this project a challenge. MDP took up the challenge and a very favourable outcome was achieved by all concerned, especially the client and residence. Resitech reference enclosed.
|
|
Recent Projects
|
Erect safety scaffold, Demolition outer brick skin, rebuild brickwork incorporating new Lintels, flashings, stainless steel ties, ornamental features etc to match original profile. Another job well done in fast time because of favourable weather and project well managed. Resitech D.O.H. reference enclosed.
|
|
Recent Projects
|
The brief was to sawcut several large openings in the pool in order to replace leaking pipes. The pool was then repaired back to profile, retiled to match and then some 2000 metres of joints were replaced using Flexurised Epoxy System. A large, specialised extent or work carried out with minimum fuss by MDP.
|
|
Recent Projects
|
Major corrosion to wharf Building RSJ columns caused brickwork to crack and become unstable. MDP were engaged by the client to demolish brickwork encasing columns, remove corrosion by Pneumatic means, weld new beam section in place, double prime using High Build Epoxy and relay new face brickwork, tied to column both the engineer and client praised the end result.
|
|
Recent Projects
|
MDP were recommended by the suppliers and selected by the client to install Sika Carbon Fibre strengthening system to ceiling beams in accordance with Engineers design. MDP completed this project and have successfully completed many strengthening projects including Sika Wrap column and beam strengthening, double layer application.
|
|
Recent Projects
|
This project, which entailed, Epoxy coating of several stairs and reinforced membrane to walkway areas, was completed in the 2 week holiday period, to the total satisfaction of the department of commerce Newcastle office.
|
|
Recent Projects
|
Another successful Epoxy Flooring Project carried out by MDP, to Australian food standards. This food preparation area required major demolition and levelling prior to Epoxy Trowel Application and Arrowhead Coveing. The client was very happy with the end result.
|
|
Recent Projects
|
MDP are awarded this project because of strict OHS & R requirements. The project required various trades to several council ovals and pavilions for maintenance works ranging from concrete repairs, electrical, waterproofing, tiling, hot water service and painting to name a few. The work was carried out safely to everyone’s satisfaction
|
|
|
Recent Projects
|
Another difficult but successful Government project. Replacement of metal roof with new Tapered / curved roofs are always a challenge and this one was not an exemption, However MDP completed the project in QuickTime and without any problems. Quote from Superintendent A difficult job made look easy because of Pre – planning and precision installation by professionals.
|
|
|
Recent Projects
|
High profile exclusive 3-unit apartment building (Penthouse balcony alone 120m2). MDP were engaged to carry out the major refurbishment because of our reputation in the industry for quality workmanship. Complete external structural and architectural finishes and Penthouse renovation. Refer to before and after photographs.
|
|
|
Recent Projects
|
Resitech D.O.H. Government project, transforming old brick building into modern new building as follows:- stainless steel brick ties, prestressed lintels, concrete repairs, polymer render and membrane, protective coating. Tenants very pleased with outcome and Resitech Superintendent “extremely happy with project”.
|
|
|
Recent Projects
|
Waterproofing project including lift motor room, main roof level, BMU pad slab, Level one balconies, Level 2 balconies, various bund areas. Three layer torch on membrane system used on roof areas with trafficable high strength system within bund areas etc.
|
|
|
Past Projects
|
Three (3) storey red brick building (approximately 45 years old) on The Esplanade, subject to high exposure to salt water spray. The main issues with the building included badly corroded brick ties, badly fretted brickwork, corroded window lintels, concrete spalling to all concrete elements and the list goes on. The proof is in the "before" and "after" photos and reference testemonials.
|
|
| | |
|
|
|